Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

{{Tutorial

name = Cable-stayed bridge staged construction

description = This tutorial is included in SAP2000 bridge examples document.

keyword = bridge; cable-stayed bridge; cable; staged construction

program = SAP2000

version = V11

status = done

id = }}

See Also

Attachments

...

Attached is a model file and a PDF which outlines the procedure for modeling a concrete box-girder bridge, a steel-girder bridge, and a cable-stayed bridge. An image of a model taken from the SAP2000 Bridge Examples document is shown in Figure 1:

Image Added

Figure 1 - SAP2000 Bridge Examples model

Attachments

Metadata

  • Name: Cable-stayed bridge

  • Description: Tutorial included in the SAP2000 bridge-examples document.

  • Program: SAP2000

  • Program Version: 11

  • Model ID: na