Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


{hidden-content} *TO DO* (see
Wiki Markup
Show if
groupeditors

TO DO (see for-name

label):

*

  • Verify
  • and
  • document
  • that
  • the
  • results
  • are
  • reported
  • relative
  • to
  • the
  • centroid
  • of
  • the
  • section.
*
  • Upload
  • model
  • and
  • create
  • a
  • related
  • test
  • problem.
*

Related

model

location:

* *

  • ondrej\test_problems\sap2000\tendons
  • as
  • load
  • and
  • elements
  • WIKI
  • XML
  • 16133\figs
  • -
  • reference,
  • insertion
  • and
  • cg
  • points\
  • (XML
  • model
  • id
  • #73)
{hidden-content} \\ The *reference point* of a bridge deck section is located at the midpoint between exterior girders. For concrete flat slabs, the reference point is midway between total width minus overhanging portions. For additional details and visuals on reference point, *insertion point*, and *center of gravity*, please see Figure 1: \\ !fig 1.png|align=center,border=1! {center-text}Figure 1 - Visuals for reference point, insertion point, and center of gravity{center-text}

The reference point of a bridge deck section is located at the midpoint between exterior girders. For concrete flat slabs, the reference point is midway between total width minus overhanging portions.

For additional details and visuals on reference point, insertion point, and center of gravity, please see Figure 1:


Image AddedFigure 1 - Visuals for reference point, insertion point, and center of gravity