Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

(2) Define a dummy structure below the overhanging portion of the lane to attract the load from the overhanging portion of the lane. This dummy structure would need to be disconnected from the actual structure.

Show if
groupeditors

Related Incidents:

  • Incident 50891: Tips for handling overhanging lanes.
  • Incident 80245: Request for automated handling of overhanging lanes.