Manual modeling of bridge foundations

Manual modeling of bridge foundations

The material presented on page, courtesy of Harry A Cole, Ph.D., P.E., serves the Mississippi Department of Transportation for training purposes.

Overview

The zipped file attached contains three PowerPoint presentations which outline the modeling process for a 2-span PCC-girder bridge with three different foundation types. Presentation topics include the following:

  1. Bent columns supported by a fixed column base (Example2-Two-Equal-Spans-Option1-Final.ppt)

  2. Fixed column base replaced with pile/cap foundation, extending column to solid-element grid at mid-depth of pile cap (Example2-Two-Equal-Spans-Option2-Final.ppt)

  3. Pile/cap foundation with bent column extending only to the top of pile cap, and Joint Constraint, in place of Weld, connecting base of column to solid-element grid at mid-depth of pile cap (Example2-Two-Equal-Spans-Option3-Final.ppt)

Attachments

Metadata

  • Name: Manual modeling of bridge foundations

  • Description: PowerPoint presentations are attached which provide detailed examples of a 2-span PCC-girder bridge with three different foundation types. A step-by-step modeling procedure, with detailed descriptions and sketches, outlines the process.

  • Program: CSiBridge

  • Program Version: 15.1.1+

  • Model ID: na

 

 

Related content

CSiBridge
CSiBridge
Read with this
Bridge modeler FAQ
Bridge modeler FAQ
More like this
Hinge first steps (CSiBridge)
Hinge first steps (CSiBridge)
Read with this
Bridge Modeler
More like this
Concrete box-girder bridge model
Concrete box-girder bridge model
More like this