Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »


Using CSiBridge, initial cable forces may be obtained for a cable-stayed bridge by following the process outlined in this article.

Modify undeformed geometry

  • Model the final geometry of the bridge in its deformed configuration.
  • On the Cable Shape Definition menu, select the option for Relative Undeformed Length.
  • Use a nonlinear load case to analyze the bridge under applied dead loads.
  • Run analysis again by selecting Analysis > Shape Finding > Modify Geometry. Iterate until deformed shape converges to the geometry desired.
  • Extract the cable forces.

Verify cable forces

The procedure used to verify these cable forces is as follows:

  • Apply the dead loads and the cable target forces (previously determined), then run a nonlinear static analysis for this loading condition.
  • If the cable forces are optimal, then the structure, when modeled in its final configuration, should experience negligible deflection under dead-load and target-cable forces.

Use the unit-load method to tune cable forces

  • If deflection is not negligible, then the unit-load method may be manually applied to determine how cable forces should be adjusted.

See Also

Unknown macro: {hidden-content}

Related Email:

  • Unknown macro: {email}
  • No labels